One of the most common questions we hear from homeowners is "How long will my renovation take?" The honest answer depends on your project scope, but we believe in setting realistic expectations from day one. Here's what typical renovation timelines look like in Northern New Jersey.
Kitchen Remodeling Timeline
A kitchen remodel is one of the most involved renovation projects because it touches nearly every trade — demolition, framing, electrical, plumbing, HVAC, drywall, cabinets, countertops, tile, painting, and appliance installation.
- Minor kitchen refresh (new countertops, cabinet refacing, backsplash): 2-4 weeks
- Mid-range remodel (new cabinets, countertops, flooring, appliances): 6-10 weeks
- Full gut renovation (new layout, moved plumbing/electrical, structural changes): 10-16 weeks
- Kitchen expansion (knocking out walls, adding space): 12-20 weeks
Key delay factors: Custom cabinetry (6-10 week lead time), natural stone countertops (2-4 week fabrication), appliance backorders, and permit approval.
Bathroom Renovation Timeline
Bathroom renovations are typically faster than kitchens due to smaller scope, but plumbing and waterproofing add complexity.
- Cosmetic update (new fixtures, paint, accessories): 1-2 weeks
- Standard renovation (new tile, vanity, toilet, fixtures): 3-5 weeks
- Full gut renovation (new layout, moved plumbing, custom shower): 5-8 weeks
- Primary suite bathroom (luxury finishes, custom features): 6-10 weeks
What takes time: Proper waterproofing membranes need curing time (you don't want shortcuts here), custom tile work is meticulous, and custom vanities have lead times.
Basement Finishing Timeline
A basement finishing project transforms raw space into livable area. The timeline depends heavily on the scope — a simple rec room is much faster than a full basement suite with bathroom and kitchenette.
- Basic rec room (framing, drywall, flooring, lighting): 4-6 weeks
- Basement with bathroom (adds plumbing rough-in, fixtures): 6-10 weeks
- Full basement suite (bedroom, bathroom, kitchenette, storage): 8-14 weeks
- Walkout basement renovation (with exterior work): 10-16 weeks
Common challenges: Moisture issues that need waterproofing first, low ceiling heights requiring creative solutions, running plumbing to new bathrooms (sometimes requiring sewer ejector pumps), and HVAC extensions.
Home Addition Timeline
Home additions are the longest projects because they involve new construction from the ground up — foundation, framing, roofing, and tying into existing systems.
- Bump-out addition (small room extension, 100-200 sq ft): 8-12 weeks
- Single room addition (master bedroom, family room): 12-18 weeks
- Multi-room addition (primary suite with bathroom): 16-24 weeks
- Second story addition: 20-30+ weeks
Why additions take longer: Architectural plans need engineering stamps, permit review for additions is more thorough (4-8 weeks alone), foundation work is weather-dependent, and tying new construction into existing structures requires careful sequencing.
Tips to Keep Your Project on Schedule
- Make decisions early. The number one cause of delays is indecision on materials, colors, and fixtures. Select everything before demo begins.
- Order materials with lead time. Custom cabinets, specialty tile, and certain appliances have long lead times. Order early.
- Be available for questions. Quick turnaround on decisions keeps the crew moving. Even a 2-day delay on a tile choice cascades into bigger delays.
- Build in a buffer. Add 15-20% to any timeline estimate. Surprises happen — especially in older NJ homes where you might find outdated wiring, hidden water damage, or asbestos.
- Trust the process. Rushing leads to mistakes. Quality work takes time, and good contractors plan each phase carefully.
Our Approach to Timelines
At La Vaca General Contractors, we provide detailed project schedules before work begins. We use project management tools to track progress, keep you updated with regular check-ins, and proactively communicate if anything changes.
Want a realistic timeline for your specific project? Contact us for a free consultation. We'll walk through your space, discuss your goals, and give you an honest assessment of how long it will take. Learn more about how we work on our process page.
